ITAC Assessment: IP0150
ITAC logo
ITAC Assessment: IP0150
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product automotive parts
NAICS 336111: Automobile Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 59
Plant Area 112,000
ft2
Annual Production 7,153,972
pieces
Production Hrs. Annual 2,465
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,096 631,220
kWh
Electricity Demand $18,996 1,900
kW-mo/yr
Electricity Fees $4,361 -
Natural Gas $120,066 24,436
MMBtu
Waste Disposal Costs
Water Usage $143 66
Tgal
TOTAL YEARLY COSTS $180,661
RECOMMENDED SAVINGS* $3,089 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,089

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4322: Use or replace with energy efficient substitutes $952 - $772
13,140
kWh
$180
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $702 $150 $389
6,620
kWh
$313
-
kW-mo/yr
-
03 2.7224: Reduce space conditioning during non-working hours $357 $9 $63
1,065
kWh
- $294
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $423 $42 $423
7,204
kWh
- -
05 2.2437: Recover waste heat from equipment $654 $1,559 $669
11,389
kWh
$(-15.0)
-
kW-mo/yr
-
TOTAL RECOMMENDED $3,089 $1,760 $2,316
39,418
kWh
$478
-
kW-mo/yr
$294
-
MMBtu
TOTAL IMPLEMENTED $3,089 $1,760 $2,316
39,418
kWh
$478
-
kW-mo/yr
$294
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs