ITAC Assessment: MZ0346
ITAC logo
ITAC Assessment: MZ0346
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Cable trays
NAICS 332618: Other Fabricated Wire Product Manufacturing
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $10
M
to 50
M
# of Employees 72
Plant Area 72,000
ft2
Annual Production 351,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,133 721,600
kWh
Electricity Demand $17,821 1,947
kW-mo/yr
Natural Gas $8,466 737
MMBtu
Waste Disposal Costs
Water Usage $1,380 188
Tgal
Water Disposal $1,678 188
Tgal
TOTAL YEARLY COSTS $108,478
RECOMMENDED SAVINGS* $13,411 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $971

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $825 $2,925 $188
1,710
kWh
$191
-
kW-mo/yr
$446
02 2.4231: Reduce the pressure of compressed air to the minimum required $967 $320 $780
7,089
kWh
$187
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,048 $6,536 $11,048
93,442
kWh
- -
04 2.6218: Turn off equipment when not in use $425 $485 $343
3,120
kWh
$82
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $146 $200 $146
1,331
kWh
- -
TOTAL RECOMMENDED $13,411 $10,466 $12,505
106,692
kWh
$460
-
kW-mo/yr
$446
TOTAL IMPLEMENTED $971 $3,125 $334
3,041
kWh
$191
-
kW-mo/yr
$446
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs