ITAC Assessment: SF0089
ITAC logo
ITAC Assessment: SF0089
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Sausage and Roast Beef
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 46
Plant Area 20,000
ft2
Annual Production 4,600,000
lb
Production Hrs. Annual 5,720
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $122,735 1,360,785
kWh
Electricity Demand $16,530 3,802
kW-mo/yr
Natural Gas $92,617 13,708
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,368 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,538

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $875 $729 $741
8,206
kWh
$134
-
kW-mo/yr
- - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $794 $462 $688
7,620
kWh
$106
-
kW-mo/yr
- - -
03 2.7135: Install occupancy sensors $301 $960 $244
2,638
kWh
$57
-
kW-mo/yr
- - -
04 2.1243: Use heat from boiler blowdown to preheat boiler feed water $7,998 $13,780 - - $7,998
-
MMBtu
- -
05 2.1233: Analyze flue gas for proper air/fuel ratio $6,869 - - - $6,869
-
MMBtu
- -
06 2.2511: Insulate bare equipment $649 $558 - - $649
-
MMBtu
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $2,018 $1,475 $1,833
20,223
kWh
$185
-
kW-mo/yr
- - -
08 3.4111: Use closed cycle process to minimize waste water production $1,670 $2,818 - - - $1,670
-
Tgal
-
09 3.6193: Install equipment (eg compactor) to reduce disposal costs $5,899 $6,395 - - - - $5,899
-
lb
10 3.4155: Meter waste water $14,295 $4,500 - - - $14,295
-
Tgal
-
TOTAL RECOMMENDED $41,368 $31,677 $3,506
38,687
kWh
$482
-
kW-mo/yr
$15,516
-
MMBtu
$15,965
-
Tgal
$5,899
-
lb
TOTAL IMPLEMENTED $8,538 $1,191 $1,429
15,826
kWh
$240
-
kW-mo/yr
$6,869
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs