ITAC Assessment: LM0076
ITAC logo
ITAC Assessment: LM0076
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Egg Flats
NAICS 322299: All Other Converted Paper Product Manufacturing
SIC 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area 50,600
ft2
Annual Production 5,500
ton
Production Hrs. Annual 8,280
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $173,000 2,509,028
kWh
Electricity Demand $32,049 4,872
kW-mo/yr
Electricity Fees $(-85,848.0) -
Natural Gas $389,504 56,742
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,703 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,984

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Personnel Changes Savings
01 3.4154: Eliminate leaks in water lines and valves $528 $25 - - $307
-
MMBtu
$172
-
Tgal
$49
-
gal
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,952 $1,300 $2,653
31,417
kWh
$299
-
kW-mo/yr
- - - -
03 2.4133: Use most efficient type of electric motors $255 $281 $222
2,622
kWh
$33
-
kW-mo/yr
- - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,953 $3,825 $4,592
37,890
kWh
$361
-
kW-mo/yr
- - - -
05 2.1131: Repair faulty insulation in furnaces, boilers, etc $6,736 $2,500 - - $6,736
-
MMBtu
- - -
06 4.111: Add equipment/ operators to reduce production bottleneck $1,766 $1,500 - - - - - $1,766
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,513 $880 $1,513
17,918
kWh
- - - - -
TOTAL RECOMMENDED $18,703 $10,311 $8,980
89,847
kWh
$693
-
kW-mo/yr
$7,043
-
MMBtu
$172
-
Tgal
$49
-
gal
$1,766
TOTAL IMPLEMENTED $11,984 $4,986 $4,388
51,957
kWh
$332
-
kW-mo/yr
$7,043
-
MMBtu
$172
-
Tgal
$49
-
gal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs