ITAC Assessment: AM0298
ITAC logo
ITAC Assessment: AM0298
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Molded plastic products, steel molds for plastic and rubber
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 88,140
ft2
Annual Production 14,000,000
pieces
Production Hrs. Annual 8,520
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $233,713 6,947,831
kWh
Electricity Demand $81,472 12,994
kW-mo/yr
Electricity Fees $6,741 -
Natural Gas $9,913 1,982
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,051 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,380

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3212: Optimize plant power factor $8,670 $21,840 - $8,670
-
kW-mo/yr
- - - - -
02 3.4116: Meter recycled water (to reduce sewer charges) $6,600 $3,500 - - - - - - $6,600
03 3.5113: Sell oil to recycler $3,960 - - - - $3,960
-
gal
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,700 $1,320 $100
4,396
kWh
$70
-
kW-mo/yr
- - - $2,530 -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,600 $130 $1,200
55,686
kWh
$1,400
-
kW-mo/yr
- - - - -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,140 - - $2,140
-
kW-mo/yr
- - - - -
07 2.2511: Insulate bare equipment $1,150 $1,000 $1,150
52,169
kWh
- - - - - -
08 3.7131: Use a rag recycle service $1,300 $350 - - - - $1,300
-
lb
- -
09 3.5316: Contract a wood pallet recycling company $1,070 - - - - - - - $1,070
10 2.8123: Pay utility bills on time $861 - - - $861 - - - -
TOTAL RECOMMENDED $31,051 $28,140 $2,450
112,251
kWh
$12,280
-
kW-mo/yr
$861 $3,960
-
gal
$1,300
-
lb
$2,530 $7,670
TOTAL IMPLEMENTED $15,380 $4,630 $2,350
107,855
kWh
$1,400
-
kW-mo/yr
- $3,960
-
gal
- - $7,670
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs