ITAC Assessment: OK0607
ITAC logo
ITAC Assessment: OK0607
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Packaged Meat
NAICS
n/a
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $10
M
to 50
M
# of Employees 450
Plant Area 125,000
ft2
Annual Production 114,000,000
lb
Production Hrs. Annual 5,400
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $340,803 12,544,000
kWh
Electricity Demand $26,681 4,356
kW-mo/yr
Electricity Fees $1,826 -
Natural Gas $450,066 143,886
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,890 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,830

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $1,830 $200 $1,350
49,824
kWh
$480
-
kW-mo/yr
-
02 4.111: Add equipment/ operators to reduce production bottleneck $43,000 $70,000 - - $43,000
-
MMBtu
03 2.2414: Use waste heat from hot flue gases to preheat $7,130 $10,700 - - $7,130
-
MMBtu
04 2.2437: Recover waste heat from equipment $14,930 $30,000 - - $14,930
-
MMBtu
TOTAL RECOMMENDED $66,890 $110,900 $1,350
49,824
kWh
$480
-
kW-mo/yr
$65,060
-
MMBtu
TOTAL IMPLEMENTED $1,830 $200 $1,350
49,824
kWh
$480
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs