ITAC Assessment: OK0491
ITAC logo
ITAC Assessment: OK0491
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Prestressed concrete and concrete pipes
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 30,000
ft2
Annual Production 30,000
ton
Production Hrs. Annual 2,080
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $33,553 691,383
kWh
Electricity Demand $368 3,502
kW-mo/yr
Electricity Fees $2,748 -
Natural Gas $48,176 14,516
MMBtu
Other Energy $16,324 1,956
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,953 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,772

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Energy Savings Other Liquid (haz) Savings
01 3.6124: Burn waste oil for heat $1,349 $2,995 - $854
-
MMBtu
- $495
-
gal
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,329 $30 $4,329
347,304
kWh
- - -
03 2.2515: Use optimum thickness insulation $12,771 $37,950 - $12,771
-
MMBtu
- -
04 2.1335: Replace gasoline with diesel, lpg, or natural gas $9,832 $27,000 - $(-6,492.0)
-
MMBtu
$16,324
-
MMBtu
-
05 2.4221: Install compressor air intakes in coolest locations $329 $655 $329
6,155
kWh
- - -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $234 $400 $328
6,155
kWh
$(-94.0)
-
MMBtu
- -
07 2.2136: Install / repair insulation on steam lines $109 $62 - $109
-
MMBtu
- -
TOTAL RECOMMENDED $28,953 $69,092 $4,986
359,614
kWh
$7,148
-
MMBtu
$16,324
-
MMBtu
$495
-
gal
TOTAL IMPLEMENTED $17,772 $39,097 $4,986
359,614
kWh
$12,786
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Energy Savings Other Liquid (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs