Assessment Year | 1996 |
---|---|
Principal Product | Prestressed concrete and concrete pipes |
NAICS |
n/a
|
SIC | 3272: Concrete Products, Except Block and Brick |
Sales Range | $5 M to 10M |
# of Employees | 50 |
Plant Area |
30,000
ft2
|
Annual Production | 30,000
ton
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $33,553 | 691,383 |
kWh
|
$0.049 |
Electricity Demand | $368 | 3,502 |
kW-mo/yr
|
$0.11 |
Electricity Fees | $2,748 | - |
|
- |
Natural Gas | $48,176 | 14,516 |
MMBtu
|
$3.32 |
Other Energy | $16,324 | 1,956 |
MMBtu
|
$8.35 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,953 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,772 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | Other Liquid (haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.6124: Burn waste oil for heat | $1,349 | $2,995 | - |
$854
-
MMBtu
|
- |
$495
-
gal
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,329 | $30 |
$4,329
347,304
kWh
|
- | - | - | |
03 | 2.2515: Use optimum thickness insulation | $12,771 | $37,950 | - |
$12,771
-
MMBtu
|
- | - | |
04 | 2.1335: Replace gasoline with diesel, lpg, or natural gas | $9,832 | $27,000 | - |
$(-6,492.0)
-
MMBtu
|
$16,324
-
MMBtu
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $329 | $655 |
$329
6,155
kWh
|
- | - | - | |
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $234 | $400 |
$328
6,155
kWh
|
$(-94.0)
-
MMBtu
|
- | - | |
07 | 2.2136: Install / repair insulation on steam lines | $109 | $62 | - |
$109
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $28,953 | $69,092 |
$4,986
359,614
kWh
|
$7,148
-
MMBtu
|
$16,324
-
MMBtu
|
$495
-
gal
|
||
TOTAL IMPLEMENTED | $17,772 | $39,097 |
$4,986
359,614
kWh
|
$12,786
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | Other Liquid (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs