Assessment Year | 1993 |
---|---|
Principal Product | Heat Processing Furnaces |
NAICS |
n/a
|
SIC | 3567: Industrial Process Furnaces and Ovens |
Sales Range | $10 M to 50M |
# of Employees | 240 |
Plant Area |
200,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $144,107 | 2,526,671 |
kWh
|
$0.057 |
Natural Gas | $40,865 | 10,862 |
MMBtu
|
$3.76 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $18,238 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,165 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.3133: Consider three or four days around-the-clock operation rather than one or two shifts per day | $12,563 | - |
$12,563
-
kWh
|
- | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,625 | $6,300 |
$2,257
39,566
kWh
|
$(-632.0)
-
MMBtu
|
|
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,318 | $2,904 | - |
$1,318
-
MMBtu
|
|
04 | 2.7494: Install storm windows and doors | $318 | $337 | - |
$318
-
MMBtu
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $928 | $3,473 |
$928
16,413
kWh
|
- | |
06 | 2.7224: Reduce space conditioning during non-working hours | $1,105 | $1,800 | - |
$1,105
-
MMBtu
|
|
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $249 | - |
$249
4,396
kWh
|
- | |
08 | 2.4221: Install compressor air intakes in coolest locations | $132 | $640 |
$132
2,345
kWh
|
- | |
TOTAL RECOMMENDED | $18,238 | $15,454 |
$16,129
62,720
kWh
|
$2,109
-
MMBtu
|
||
TOTAL IMPLEMENTED | $2,165 | $5,913 |
$1,060
18,758
kWh
|
$1,105
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs