ITAC Assessment: LE0572
ITAC logo
ITAC Assessment: LE0572
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Polished Motor Veichles Parts
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $500
k
to 1
M
# of Employees 29
Plant Area 66,000
ft2
Annual Production 3,744
units
Production Hrs. Annual 6,110
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,932 950,114
kWh
Electricity Demand $19,627 3,841
kW-mo/yr
Electricity Fees $3,303 -
Natural Gas $100,782 19,711
MMBtu
TOTAL YEARLY COSTS $178,644
RECOMMENDED SAVINGS* $28,113 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7224: Reduce space conditioning during non-working hours $812 - $807
13,911
kWh
- $5
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,039 - $927
15,987
kWh
$112
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,562 $4,791 $3,642
62,790
kWh
$920
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,224 $13,206 $9,120
157,248
kWh
$1,104
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $1,754 $4,000 $1,672
28,829
kWh
$82
-
kW-mo/yr
-
06 2.7232: Replace existing hvac unit with high efficiency model $9,722 $48,010 $9,272
159,869
kWh
$450
-
kW-mo/yr
-
TOTAL RECOMMENDED $28,113 $70,007 $25,440
438,634
kWh
$2,668
-
kW-mo/yr
$5
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs