ITAC Assessment: MI0445
ITAC logo
ITAC Assessment: MI0445
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Pharmaceuticals
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $100
M
to 500
M
# of Employees 170
Plant Area 480,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,852,531 14,191,320
kWh
Electricity Demand $329,995 34,264
kW-mo/yr
Electricity Fees $190,809 -
TOTAL YEARLY COSTS $3,373,335
RECOMMENDED SAVINGS* $837,486 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.2622: Replace existing chiller with high efficiency model $427,475 $602,500 $400,084
1,990,468
kWh
$27,391
-
kW-mo/yr
-
02 2.4133: Use most efficient type of electric motors $217,248 $42,472 $203,331
1,011,598
kWh
$13,917
-
kW-mo/yr
-
03 2.8123: Pay utility bills on time $80,165 - - - $80,165
04 2.3212: Optimize plant power factor $46,588 $99,444 - $46,588
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $32,574 $11,027 $30,487
151,679
kWh
$2,087
-
kW-mo/yr
-
06 2.8114: Change rate schedules or other changes in utility service $19,584 $150 - - $19,584
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,583 $5,793 $9,905
49,281
kWh
$678
-
kW-mo/yr
-
08 2.7135: Install occupancy sensors $3,269 $2,860 $3,269
16,265
kWh
- -
TOTAL RECOMMENDED $837,486 $764,246 $647,076
3,219,291
kWh
$90,661
-
kW-mo/yr
$99,749
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs