ITAC Assessment: OK0578
ITAC logo
ITAC Assessment: OK0578
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Electric motor repair
NAICS
n/a
SIC 3621: Motors and Generators
Sales Range $5
M
to 10
M
# of Employees 32
Plant Area 125,000
ft2
Annual Production 520
pieces
Production Hrs. Annual 5,200
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $21,772 771,688
kWh
Electricity Demand $25,430 -
Electricity Fees $3,944 -
Natural Gas $30,033 6,960
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,106 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Water Disposal Savings Personnel Changes Savings
01 3.4154: Eliminate leaks in water lines and valves $1,087 $500 n/a - - $1,087
-
Tgal
-
02 2.4221: Install compressor air intakes in coolest locations $294 $110 n/a $294
4,689
kWh
- - -
03 2.7135: Install occupancy sensors $325 $2,165 n/a $325
10,551
kWh
- - -
04 4.211: Consider use / purchase of bulk materials where possible $7,200 $1,680 n/a - - - $7,200
05 2.3512: De-energize excess transformer capacity $9,766 $12,000 n/a - $9,766 - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $434 $6,549 n/a $434
7,034
kWh
- - -
TOTAL RECOMMENDED $19,106 $23,004 $1,053
22,274
kWh
$9,766 $1,087
-
Tgal
$7,200
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs