ITAC Assessment: MI0415
ITAC logo
ITAC Assessment: MI0415
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Plastic Packaging
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area 50,000
ft2
Annual Production 1,300,000
units
Production Hrs. Annual 8,736
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $995,504 3,809,400
kWh
Electricity Demand $56,820 6,312
kW-mo/yr
Electricity Fees $2,380 -
LPG $467,692 20,805
MMBtu
Fuel Oil #2 $15,805 490
MMBtu
TOTAL YEARLY COSTS $1,538,201
RECOMMENDED SAVINGS* $257,876 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,767

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings Fuel Oil #2 Savings Ancillary Material Cost Savings
01 2.7135: Install occupancy sensors $10,535 $3,084 $10,535
40,363
kWh
- - - - -
02 2.7221: Lower temperature during the winter season and vice-versa $10,767 $960 $10,282
39,393
kWh
$485
-
kW-mo/yr
- - - -
03 2.1224: Replace boiler $73,846 $170,000 - - - $73,846
-
MMBtu
- -
04 2.3212: Optimize plant power factor $4,830 $7,950 - $4,830
-
kW-mo/yr
- - - -
05 2.8114: Change rate schedules or other changes in utility service $142,120 $2,400 - - $142,120 - - -
06 2.8226: Increase efficiency of trucks $15,778 $12,180 - - - - $7,903
-
MMBtu
$7,875
TOTAL RECOMMENDED $257,876 $196,574 $20,817
79,756
kWh
$5,315
-
kW-mo/yr
$142,120 $73,846
-
MMBtu
$7,903
-
MMBtu
$7,875
TOTAL IMPLEMENTED $10,767 $960 $10,282
39,393
kWh
$485
-
kW-mo/yr
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings Fuel Oil #2 Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs