ITAC Assessment: MI0419
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Shopper Print
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 120,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 7,488
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,191,888 4,447,080
kWh
Electricity Demand $140,617 15,523
kW-mo/yr
Electricity Fees $20,452 -
LPG $421,181 21,411
MMBtu
TOTAL YEARLY COSTS $1,774,138
RECOMMENDED SAVINGS* $71,713 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $69,696

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $28,061 $1,060 $26,619
99,323
kWh
$1,442
-
kW-mo/yr
-
02 2.3112: Store heated/ cooled water for use during peak demand periods $19,853 $37,026 - $19,853
-
kW-mo/yr
-
03 2.8123: Pay utility bills on time $15,232 - - - $15,232
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,550 $2,325 $6,213
23,183
kWh
$337
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,018 $4,860 $1,914
7,142
kWh
$104
-
kW-mo/yr
-
TOTAL RECOMMENDED $71,713 $45,271 $34,746
129,648
kWh
$21,735
-
kW-mo/yr
$15,232
TOTAL IMPLEMENTED $69,696 $40,411 $32,832
122,506
kWh
$21,632
-
kW-mo/yr
$15,232
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs