| Assessment Year | 2023 |
|---|---|
| Principal Product | Medical Devices |
| NAICS | 339112: Surgical and Medical Instrument Manufacturing |
| SIC | 3841: Surgical and Medical Instruments and Apparatus |
| Sales Range | $10 M to 50M |
| # of Employees | 300 |
| Plant Area |
72,000
ft2
|
| Annual Production | 1,000,000
pieces
|
| Production Hrs. Annual | 8,568
hrs
|
| Location (State) | Puerto Rico |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,428,992 | 5,567,760 |
kWh
|
$0.26 |
| Electricity Demand | $82,200 | 10,046 |
kW-mo/yr
|
$8.18 |
| Electricity Fees | $5,203 | - |
|
- |
| TOTAL YEARLY COSTS | $1,516,395 | |||
| RECOMMENDED SAVINGS* | $48,336 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $26,925 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $18,053 | $1,060 |
$16,491
64,167
kWh
|
$1,562
-
kW-mo/yr
|
- | |
| 02 | 2.7221: Lower temperature during the winter season and vice-versa | $14,947 | $240 |
$14,309
55,678
kWh
|
$638
-
kW-mo/yr
|
- | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,069 | $4,697 |
$6,753
26,276
kWh
|
$316
-
kW-mo/yr
|
- | |
| 04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,790 | $4,860 |
$2,671
10,393
kWh
|
$119
-
kW-mo/yr
|
- | |
| 05 | 2.8114: Change rate schedules or other changes in utility service | $1,869 | $100 | - | - | $1,869 | |
| 06 | 2.4239: Eliminate or reduce compressed air usage | $1,805 | $2,630 |
$1,159
4,509
kWh
|
$646
-
kW-mo/yr
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,803 | $791 |
$1,726
6,717
kWh
|
$77
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $48,336 | $14,378 |
$43,109
167,740
kWh
|
$3,358
-
kW-mo/yr
|
$1,869 | ||
| TOTAL IMPLEMENTED | $26,925 | $6,548 |
$24,970
97,160
kWh
|
$1,955
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs