ITAC Assessment: AS0431
ITAC logo
ITAC Assessment: AS0431
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Food
NAICS 333241: Food Product Machinery Manufacturing
SIC 3556: Food Products Machinery
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 333,294
ft2
Annual Production 15,000,000
lb
Production Hrs. Annual 780
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $117,496 1,508,050
kWh
Electricity Demand $3,148 624
kW-mo/yr
Natural Gas $337,987 40,835
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,441 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.9112: Use solar heat to heat water $1,728 $8,800 $1,728
21,605
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $1,413 $1,500 - $1,413
-
MMBtu
03 2.2414: Use waste heat from hot flue gases to preheat $529 $1,500 - $529
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $401 $1,500 - $401
-
MMBtu
05 2.2414: Use waste heat from hot flue gases to preheat $370 $1,000 - $370
-
MMBtu
TOTAL RECOMMENDED $4,441 $14,300 $1,728
21,605
kWh
$2,713
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs