Assessment Year | 2024 |
---|---|
Principal Product | Medical Devices |
NAICS | 339112: Surgical and Medical Instrument Manufacturing |
SIC | 3841: Surgical and Medical Instruments and Apparatus |
Sales Range | $100 M to 500M |
# of Employees | 249 |
Plant Area |
102,000
ft2
|
Annual Production | 354,000,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Puerto Rico |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,384,380 | 10,533,600 |
kWh
|
$0.23 |
Electricity Demand | $165,373 | 20,502 |
kW-mo/yr
|
$8.07 |
Electricity Fees | $5,190 | - |
|
- |
LPG | $53,628 | 2,753 |
MMBtu
|
$19.48 |
TOTAL YEARLY COSTS | $2,608,571 | |||
RECOMMENDED SAVINGS* | $843,899 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $127,499 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | LPG Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $595,572 | $1,797,720 |
$1,255,174
5,545,080
kWh
|
$61,269
-
kW-mo/yr
|
- |
$(-774,499.0)
-
MMBtu
|
$53,628
-
MMBtu
|
|
02 | 2.4239: Eliminate or reduce compressed air usage | $127,058 | $120 |
$110,902
490,718
kWh
|
$16,156
-
kW-mo/yr
|
- | - | - | |
03 | 2.8114: Change rate schedules or other changes in utility service | $92,403 | $2,400 | - | - | $92,403 | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $28,425 | $24,780 |
$27,022
119,565
kWh
|
$1,403
-
kW-mo/yr
|
- | - | - | |
05 | 2.7135: Install occupancy sensors | $441 | $433 |
$376
1,663
kWh
|
$65
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $843,899 | $1,825,453 |
$1,393,474
6,157,026
kWh
|
$78,893
-
kW-mo/yr
|
$92,403 |
$(-774,499.0)
-
MMBtu
|
$53,628
-
MMBtu
|
||
TOTAL IMPLEMENTED | $127,499 | $553 |
$111,278
492,381
kWh
|
$16,221
-
kW-mo/yr
|
- | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs