ITAC Assessment: MI0412
ITAC logo
ITAC Assessment: MI0412
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Cigars
NAICS 312230: Tobacco Manufacturing
SIC 2121: Cigars
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area 270,000
ft2
Annual Production 800,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,933,669 8,406,767
kWh
Electricity Demand $116,890 13,364
kW-mo/yr
Electricity Fees $5,400 -
TOTAL YEARLY COSTS $2,055,959
RECOMMENDED SAVINGS* $252,900 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $126,797 $24,547 $117,834
512,322
kWh
$8,963
-
kW-mo/yr
-
02 3.1161: Eliminate/reduce an operation $73,444 $22,400 $68,253
296,750
kWh
$5,191
-
kW-mo/yr
-
03 2.4238: Do not use compressed air for personal cooling $9,634 $2,055 $8,952
38,923
kWh
$682
-
kW-mo/yr
-
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,603 $6,042 - - $2,603
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $40,422 $1,980 $31,206
135,680
kWh
$9,216
-
kW-mo/yr
-
TOTAL RECOMMENDED $252,900 $57,024 $226,245
983,675
kWh
$24,052
-
kW-mo/yr
$2,603
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs