Assessment Year | 1988 |
---|---|
Principal Product | PREPARED SALADS |
NAICS |
n/a
|
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 50 |
Plant Area |
n/a
|
Annual Production | 6,000,000
lb
|
Production Hrs. Annual | 2,020
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $40,534 | 726,553 |
kWh
|
$0.056 |
Natural Gas | $11,491 | 2,949 |
MMBtu
|
$3.90 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $5,862 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,765 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2135: Repair and eliminate steam leaks | $1,527 | $350 | - |
$1,527
-
MMBtu
|
|
02 | 2.8121: Apply for tax-free status for energy purchases | $847 | $2,500 | - |
$847
-
MMBtu
|
|
03 | 2.6218: Turn off equipment when not in use | $777 | - | - |
$777
-
MMBtu
|
|
04 | 2.3132: Recharge batteries on during off-peak demand periods | $600 | - |
$600
19,637
kWh
|
- | |
05 | 2.7261: Install timers and/or thermostats | $609 | $180 |
$328
10,844
kWh
|
$281
-
MMBtu
|
|
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $478 | $250 | - |
$478
-
MMBtu
|
|
07 | 2.8112: Combine utility meters | $381 | $200 | - |
$381
-
MMBtu
|
|
08 | 2.2437: Recover waste heat from equipment | $320 | $1,100 | - |
$320
-
MMBtu
|
|
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $265 | $150 |
$265
8,792
kWh
|
- | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $58 | $400 |
$58
879
kWh
|
- | |
TOTAL RECOMMENDED | $5,862 | $5,130 |
$1,251
40,152
kWh
|
$4,611
-
MMBtu
|
||
TOTAL IMPLEMENTED | $4,765 | $4,030 |
$1,251
40,152
kWh
|
$3,514
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs