ITAC Assessment: AM0046
ITAC logo
ITAC Assessment: AM0046
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product PREPARED SALADS
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area
n/a
Annual Production 6,000,000
lb
Production Hrs. Annual 2,020
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,534 726,553
kWh
Natural Gas $11,491 2,949
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,862 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,765

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2135: Repair and eliminate steam leaks $1,527 $350 - $1,527
-
MMBtu
02 2.8121: Apply for tax-free status for energy purchases $847 $2,500 - $847
-
MMBtu
03 2.6218: Turn off equipment when not in use $777 - - $777
-
MMBtu
04 2.3132: Recharge batteries on during off-peak demand periods $600 - $600
19,637
kWh
-
05 2.7261: Install timers and/or thermostats $609 $180 $328
10,844
kWh
$281
-
MMBtu
06 2.1233: Analyze flue gas for proper air/fuel ratio $478 $250 - $478
-
MMBtu
07 2.8112: Combine utility meters $381 $200 - $381
-
MMBtu
08 2.2437: Recover waste heat from equipment $320 $1,100 - $320
-
MMBtu
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $265 $150 $265
8,792
kWh
-
10 2.7142: Utilize higher efficiency lamps and/or ballasts $58 $400 $58
879
kWh
-
TOTAL RECOMMENDED $5,862 $5,130 $1,251
40,152
kWh
$4,611
-
MMBtu
TOTAL IMPLEMENTED $4,765 $4,030 $1,251
40,152
kWh
$3,514
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs