Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49,326

matching recommendations
$
$
ARC Building and grounds
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1130 #09 Y:2026 Install occupancy sensors $728 $393
UD1130 #08 Y:2026 Disconnect ballasts $901 $300
UD1130 #07 Y:2026 Utilize higher efficiency lamps and/or ballasts $996 $759
NT0058 #08 Y:2026 Lower temperature during the winter season and vice-versa $2,475 -
NT0058 #06 Y:2026 Utilize higher efficiency lamps and/or ballasts $3,608 $6,871
NT0058 #03 Y:2026 Keep doors and windows shut when not on use $47,399 -
NT0058 #02 Y:2026 Replace existing hvac unit with high efficiency model $105,430 $139,090
UD1128 #05 Y:2026 Install vinyl strip / high speed / air curtain doors $172 $600
UD1128 #04 Y:2026 Reduce ventilation air $31,291 -
UD1128 #03 Y:2026 Use separate switches on perimeter lighting which may be turned off when natural light is available $2,524 -
MS0465 #06 Y:2026 Clean or color roof to reduce solar load $4,092 $42,669
MS0465 #05 Y:2026 Lower temperature during the winter season and vice-versa $4,474 -
MS0465 #04 Y:2026 Reschedule and rearrange multiple-source heating systems $14,437 -
MS0465 #03 Y:2026 Keep doors and windows shut when not on use $39,664 $104,260
WV0697 #07 Y:2026 Install occupancy sensors $2,152 $1,620
UD1127 #02 Y:2026 Reduce space conditioning during non-working hours $9,974 -
UD1127 #01 Y:2026 Reduce space conditioning during non-working hours $12,399 $3,735
MU0082 #11 Y:2026 Close holes and openings in building such as broken windows $44 $71
MU0082 #10 Y:2026 Install timers and/or thermostats $124 $240
MU0082 #09 Y:2026 Use radiant heater for spot heating $2,820 $5,865