ITAC Assessment: UL2510
ITAC logo
ITAC Assessment: UL2510
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Fabricated Metal
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 70,000
ft2
Annual Production 987
units
Production Hrs. Annual 2,500
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,600 716,680
kWh
Electricity Demand $763 4,257
kW-mo/yr
Electricity Fees $5,379 -
Natural Gas $29,461 3,181
MMBtu
TOTAL YEARLY COSTS $117,203
RECOMMENDED SAVINGS* $80,869 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,769 $3,240 $3,769
33,104
kWh
-
02 2.9114: Use solar heat to make electricty $71,181 $417,175 $70,987
623,465
kWh
$194
-
kW-mo/yr
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,413 $9,750 $4,413
38,742
kWh
-
04 2.7135: Install occupancy sensors $1,506 $185 $1,506
13,225
kWh
-
TOTAL RECOMMENDED $80,869 $430,350 $80,675
708,536
kWh
$194
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs