ITAC Assessment: TT0337
ITAC logo
ITAC Assessment: TT0337
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Metal Coating
NAICS 325510: Paint and Coating Manufacturing
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $1
M
to 5
M
# of Employees 19
Plant Area 60,000
ft2
Annual Production 1,500,000
pieces
Production Hrs. Annual 2,200
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,421 235,980
kWh
Natural Gas $87,900 10,363
MMBtu
Waste Disposal Costs
Water Usage $2,120 153
Tgal
Water Disposal $790 153
Tgal
TOTAL YEARLY COSTS $121,231
RECOMMENDED SAVINGS* $166,214 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.1121: Use insulation in furnaces to facilitate heating / cooling $1,309 $1,884 - $1,309
-
MMBtu
-
02 2.1125: Convert to oxyfuel burners $37,798 $25,000 $4,198
32,802
kWh
$33,600
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,154 $1,570 $6,154
47,740
kWh
- -
04 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $210 $500 $210
1,711
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,274 $12,000 $5,274
40,920
kWh
- -
06 2.1116: Improve combustion control capability $2,372 $1,000 - $2,372
-
MMBtu
-
07 2.4323: Use optimum size and capacity equipment $2,382 $16,500 $2,382
18,480
kWh
- -
08 2.4157: Establish a predictive maintenance program $108,000 $12,300 - - $108,000
09 2.2437: Recover waste heat from equipment $2,714 $5,000 - $2,714
-
MMBtu
-
TOTAL RECOMMENDED $166,214 $75,754 $18,218
141,653
kWh
$39,995
-
MMBtu
$108,000
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs