| Assessment Year | 1992 |
|---|---|
| Principal Product | Asphalt and Concrete |
| NAICS |
n/a
|
| SIC | 2951: Asphalt Paving Mixtures and Blocks |
| Sales Range | $1 M to 5M |
| # of Employees | 29 |
| Plant Area |
4,160
ft2
|
| Annual Production | 220,000
ton
|
| Production Hrs. Annual | 3,337
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $59,693 | 774,912 |
kWh
|
$0.077 |
| Natural Gas | $206,007 | 74,103 |
MMBtu
|
$2.78 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $24,490 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $24,220 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.8121: Apply for tax-free status for energy purchases | $2,400 | $250 |
$2,400
-
kWh
|
- | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,760 | $1,500 | - |
$4,760
-
MMBtu
|
|
| 03 | 2.2136: Install / repair insulation on steam lines | $1,210 | $670 | - |
$1,210
-
MMBtu
|
|
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $360 | $150 |
$360
5,275
kWh
|
- | |
| 05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $6,640 | $3,600 | - |
$6,640
-
MMBtu
|
|
| 06 | 2.4224: Upgrade controls on compressors | $780 | $500 |
$780
11,723
kWh
|
- | |
| 07 | 2.2511: Insulate bare equipment | $850 | $1,700 | - |
$850
-
MMBtu
|
|
| 08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,740 | $6,570 |
$2,740
33,705
kWh
|
- | |
| 09 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,440 | $2,440 |
$2,440
36,635
kWh
|
- | |
| 10 | 2.4133: Use most efficient type of electric motors | $2,040 | $6,300 |
$2,040
25,791
kWh
|
- | |
| 11 | 2.4133: Use most efficient type of electric motors | $270 | $670 |
$270
2,638
kWh
|
- | |
| TOTAL RECOMMENDED | $24,490 | $24,350 |
$11,030
115,767
kWh
|
$13,460
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $24,220 | $23,680 |
$10,760
113,129
kWh
|
$13,460
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs