Assessment Year | 2025 |
---|---|
Principal Product | Outdoor Furniture and Cabanas |
NAICS | 337215: Showcase, Partition, Shelving, and Locker Manufacturing |
SIC | 2511: Wood Household Furniture, Except Upholstered |
Sales Range | $100 M to 500M |
# of Employees | 400 |
Plant Area |
250,000
ft2
|
Annual Production | 100,000,000
pieces
|
Production Hrs. Annual | 4,500
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $117,588 | 2,182,314 |
kWh
|
$0.054 | |
Electricity Demand | $98,961 | 6,465 |
kW-mo/yr
|
$15.31 | |
Electricity Fees | $47,030 | - |
|
- | |
Natural Gas | $32,707 | 5,497 |
MMBtu
|
$5.95 | |
Waste Disposal Costs | |||||
Water Usage | $8,982 | 19,464 |
Tgal
|
$0.46 | |
Water Disposal | $21,755 | 19,464 |
Tgal
|
$1.12 | |
TOTAL YEARLY COSTS | $327,023 | ||||
RECOMMENDED SAVINGS* | $121,572 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7314: Reduce ventilation air | $15,201 | - |
$8,657
160,313
kWh
|
$6,544
-
kW-mo/yr
|
- | - | |
02 | 2.7224: Reduce space conditioning during non-working hours | $26,962 | $1,320 |
$26,962
499,289
kWh
|
- | - | - | |
03 | 2.7221: Lower temperature during the winter season and vice-versa | $12,056 | $600 |
$6,867
127,171
kWh
|
$5,189
-
kW-mo/yr
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $33,158 | $1,980 |
$23,866
441,966
kWh
|
$9,292
-
kW-mo/yr
|
- | - | |
05 | 2.7135: Install occupancy sensors | $5,576 | $918 |
$3,176
58,806
kWh
|
$2,400
-
kW-mo/yr
|
- | - | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $7,551 | $1,520 | - | - |
$7,551
-
MMBtu
|
- | |
07 | 2.6218: Turn off equipment when not in use | $10,839 | $2,400 |
$10,839
200,714
kWh
|
- | - | - | |
08 | 3.4155: Meter waste water | $2,180 | $2,348 | - | - | - |
$2,180
-
Tgal
|
|
09 | 2.7232: Replace existing hvac unit with high efficiency model | $3,712 | $6,585 |
$2,114
39,156
kWh
|
$1,598
-
kW-mo/yr
|
- | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,337 | $10,164 |
$2,470
45,738
kWh
|
$1,867
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $121,572 | $27,835 |
$84,951
1,573,153
kWh
|
$26,890
-
kW-mo/yr
|
$7,551
-
MMBtu
|
$2,180
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs