Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,475

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0375 #08 Y:2025 Replace hydraulic / pneumatic equipment with electric equipment $7,435 $12,750
MZ0375 #07 Y:2025 Use solar heat to make electricty $34,746 $214,502
MZ0375 #06 Y:2025 Lower temperature during the winter season and vice-versa $4,865 -
MZ0375 #05 Y:2025 Install occupancy sensors $295 $2,100
MZ0374 #05 Y:2025 Remove or close off unneeded compressed air lines $1,884 $4,020
MZ0374 #04 Y:2025 Eliminate or reduce compressed air usage $10,170 $7,950
MZ0374 #02 Y:2025 Re-use or recycle hot or cold process exhaust air $4,818 $13,380
MZ0374 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $1,642 $3,212
MZ1014 #06 Y:2025 Use solar heat to make electricty $20,398 $146,247
MZ1014 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $2,690 $3,100
MZ1014 #04 Y:2025 Install occupancy sensors $412 $950
MZ1014 #03 Y:2025 Use solar heat to heat water $3,721 $34,860
MZ1014 #02 Y:2025 Replace existing chiller with high efficiency model $17,333 $125,000
MZ1014 #01 Y:2025 Insulate bare equipment $2,794 $5,642
MZ0373 #10 Y:2025 Install occupancy sensors $882 $1,200
MZ0373 #09 Y:2025 Utilize higher efficiency lamps and/or ballasts $463 $948
MZ0373 #08 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $38,188 $16,280
MZ0373 #07 Y:2025 Lower temperature during the winter season and vice-versa $2,825 -
MZ0373 #06 Y:2025 Utilize energy-efficient belts and other improved mechanisms $155 -
MZ0373 #05 Y:2025 Replace existing chiller with high efficiency model $16,241 $120,000