Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,409

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ1006 #05 Y:2024 Use solar heat to make electricty $40,918 $292,501
MZ1006 #04 Y:2024 Use properly designed and sized hvac equipment $2,976 $42,025
MZ1006 #03 Y:2024 Utilize energy-efficient belts and other improved mechanisms $803 -
MZ1005 #04 Y:2024 Replace treated water with well / surface water $14,825 $110,000
MZ1005 #03 Y:2024 Eliminate or reduce compressed air usage $478 $196
MZ1005 #01 Y:2024 Replace existing hvac unit with high efficiency model $17,664 $184,235
MZ0360 #04 Y:2024 Recover waste heat from equipment $3,193 $8,300
MZ0360 #02 Y:2024 Remove or close off unneeded compressed air lines $8,851 $11,852
MZ0360 #01 Y:2024 Install compressor air intakes in coolest locations $1,834 $5,300
MZ1004 #04 Y:2024 Replace boiler $15,382 $100,750
MZ1003 #02 Y:2024 Use solar heat to make electricty $10,196 $78,000
MZ1003 #01 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $542 $1,660
MZ1002 #03 Y:2024 Lower temperature during the winter season and vice-versa $4,387 $2,260
MZ0358 #07 Y:2024 Use waste heat from hot flue gases to preheat incoming fluids $4,887 $14,220
MZ0356 #09 Y:2023 Replace treated water with well / surface water $10,677 $100,000
MZ0356 #08 Y:2023 Meter recycled water (to reduce sewer charges) $7,202 $7,540
MZ0356 #07 Y:2023 Clean or color roof to reduce solar load $135,000 $306,035
MZ0356 #06 Y:2023 Use solar heat to make electricty $525,252 $3,450,533
MZ0356 #03 Y:2023 Recover waste heat from equipment $29,176 $63,400
MZ0356 #02 Y:2023 Eliminate or reduce compressed air usage $10,731 $440