ITAC Assessment: MZ1004
ITAC logo
ITAC Assessment: MZ1004
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product medical services
NAICS 622110: General Medical and Surgical Hospitals
SIC 8062: General Medical and Surgical Hospitals
Sales Range less than $500
k
# of Employees 100
Plant Area 130,000
ft2
Annual Production 1
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $388,522 4,349,142
kWh
Natural Gas $60,948 14,322
MMBtu
Waste Disposal Costs
Water Usage $9,565 216
Tgal
TOTAL YEARLY COSTS $459,035
RECOMMENDED SAVINGS* $50,836 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $971 $598 - $971
-
MMBtu
02 2.7135: Install occupancy sensors $227 $250 $227
2,554
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $34,256 $21,075 $34,256
384,899
kWh
-
04 2.1224: Replace boiler $15,382 $100,750 - $15,382
-
MMBtu
TOTAL RECOMMENDED $50,836 $122,673 $34,483
387,453
kWh
$16,353
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs