ITAC Assessment: MZ1006
ITAC logo
ITAC Assessment: MZ1006
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product University Research and Teaching Building
NAICS 611310: Colleges, Universities, and Professional Schools
SIC 8221: Colleges, Universities, and Professional Schools
Sales Range less than $500
k
# of Employees 1
Plant Area 36,500
ft2
Annual Production 1
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $195,072 2,947,350
kWh
Electricity Demand $87,803 5,246
kW-mo/yr
Waste Disposal Costs
Water Usage $27,176 4,705
Tgal
TOTAL YEARLY COSTS $310,051
RECOMMENDED SAVINGS* $48,005 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.7135: Install occupancy sensors $1,443 $750 $1,443
21,868
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,865 $676 $1,295
19,622
kWh
$450
-
kW-mo/yr
$120
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $803 - $602
9,115
kWh
$201
-
kW-mo/yr
-
04 2.7233: Use properly designed and sized hvac equipment $2,976 $42,025 $2,976
45,088
kWh
- -
05 2.9114: Use solar heat to make electricty $40,918 $292,501 $27,744
420,357
kWh
$13,174
-
kW-mo/yr
-
TOTAL RECOMMENDED $48,005 $335,952 $34,060
516,050
kWh
$13,825
-
kW-mo/yr
$120
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs