Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Kitchen and bath cabinets
NAICS 337110: Wood Kitchen Cabinet and Countertop Manufacturing
SIC 2434: Wood Kitchen Cabinets
Sales Range $50
M
to 100
M
# of Employees 750
Plant Area 214,000
ft2
Annual Production 250,000
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $347,812 6,157,271
kWh
Electricity Demand $51,423 15,405
kW-mo/yr
Natural Gas $269,513 24,732
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $74,730 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $58,875

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $24,804 $7,172 $24,804
442,135
kWh
- - - -
02 2.5115: Reposition oven walls to reduce heated space $15,876 $4,452 $9,401
167,581
kWh
$1,557
-
kW-mo/yr
$4,918
-
MMBtu
- -
03 2.2531: Re-size charging openings or add movable cover or door $3,246 $1,162 - - $3,246
-
MMBtu
- -
04 2.6127: Maintain air filters by cleaning or replacement $8,530 $1,852 $5,667
101,021
kWh
- - $1,010 $1,853
05 2.4239: Eliminate or reduce compressed air usage $9,388 $2,619 $8,054
143,562
kWh
$1,334
-
kW-mo/yr
- - -
06 2.3212: Optimize plant power factor $6,971 $17,098 - $6,971
-
kW-mo/yr
- - -
07 2.4239: Eliminate or reduce compressed air usage $3,766 $432 $3,232
57,626
kWh
$534
-
kW-mo/yr
- - -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,795 $398 $1,539
27,432
kWh
$256
-
kW-mo/yr
- - -
09 2.6211: Conserve energy by efficient use of vending machines $354 $650 $338
6,023
kWh
$16
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $74,730 $35,835 $53,035
945,380
kWh
$10,668
-
kW-mo/yr
$8,164
-
MMBtu
$1,010 $1,853
TOTAL IMPLEMENTED $58,875 $16,235 $47,030
838,336
kWh
$3,681
-
kW-mo/yr
$8,164
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs