ITAC Assessment: OR0346
ITAC logo
ITAC Assessment: OR0346
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Pumps
NAICS
n/a
SIC 3561: Pumps and Pumping Equipment
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area
n/a
Annual Production 86,000
pieces
Production Hrs. Annual 5,148
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,704 1,682,005
kWh
Electricity Demand $15,259 45,648
kW-mo/yr
Electricity Fees $2,433 -
Natural Gas $8,001 1,148
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $185,880 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $129,400

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Product Savings
01 4.513: Re-arrange equipment layout to reduce labor costs $129,400 $58,090 - - - $129,400 -
02 4.621: Use fixtures to reduce machine changeout times $44,400 $5,000 - - - $20,600 $23,800
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,339 $2,000 $1,339
40,739
kWh
- - - -
04 2.4224: Upgrade controls on compressors $3,664 $1,430 $3,664
111,372
kWh
- - - -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $7,077 $24,750 $(-26.0)
(-1,172)
kWh
$(-37.0)
-
kW-mo/yr
$7,140
-
lb
- -
TOTAL RECOMMENDED $185,880 $91,270 $4,977
150,939
kWh
$(-37.0)
-
kW-mo/yr
$7,140
-
lb
$150,000 $23,800
TOTAL IMPLEMENTED $129,400 $58,090 - - - $129,400 -