Assessment Year | 2024 |
---|---|
Principal Product | Large advertising signs |
NAICS | 339950: Sign Manufacturing |
SIC | 3993: Signs and Advertising Specialties |
Sales Range | $50 M to 100M |
# of Employees | 157 |
Plant Area |
147,500
ft2
|
Annual Production | 17,500
pieces
|
Production Hrs. Annual | 5,880
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $193,409 | 1,869,619 |
kWh
|
$0.10 | |
Natural Gas | $70,020 | 5,854 |
MMBtu
|
$11.96 | |
Waste Disposal Costs | |||||
Water Usage | $2,807 | 390 |
Tgal
|
$7.19 | |
Water Disposal | $1,751 | 390 |
Tgal
|
$4.48 | |
TOTAL YEARLY COSTS | $267,987 | ||||
RECOMMENDED SAVINGS* | $54,256 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $5,079 | $9,499 |
$5,079
50,781
kWh
|
- | |
02 | 2.4239: Eliminate or reduce compressed air usage | $1,335 | $2,050 |
$1,335
13,349
kWh
|
- | |
03 | 2.9114: Use solar heat to make electricty | $42,019 | $292,428 |
$42,019
420,194
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,943 | $7,560 |
$1,212
12,120
kWh
|
$731 | |
05 | 2.7135: Install occupancy sensors | $1,125 | $1,100 |
$1,125
11,256
kWh
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $496 | $2,600 |
$496
4,976
kWh
|
- | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,259 | $5,474 |
$2,259
22,590
kWh
|
- | |
TOTAL RECOMMENDED | $54,256 | $320,711 |
$53,525
535,266
kWh
|
$731 | ||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs