ITAC Assessment: LS2220
ITAC logo
ITAC Assessment: LS2220
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Chocolate and Cocoa Products
NAICS 311351: Chocolate and Confectionery Manufacturing from Cacao Beans
SIC 2066: Chocolate and Cocoa Products
Sales Range less than $500
k
# of Employees 400
Plant Area 768,379
ft2
Annual Production 10,400
ton
Production Hrs. Annual 6,240
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,173,633 13,197,000
kWh
Natural Gas $211,113 26,498
MMBtu
TOTAL YEARLY COSTS $1,384,746
RECOMMENDED SAVINGS* $31,353 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,566

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7135: Install occupancy sensors $5,118 $300 $5,118
57,508
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $448 $270 $448
5,030
kWh
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,145 $750 $1,145
12,864
kWh
04 2.7425: Clean or color roof to reduce solar load $24,642 $68,828 $24,642
276,876
kWh
TOTAL RECOMMENDED $31,353 $70,148 $31,353
352,278
kWh
TOTAL IMPLEMENTED $5,566 $570 $5,566
62,538
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs