ITAC Assessment: CM1024
ITAC logo
ITAC Assessment: CM1024
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Model Rocket Engines
NAICS 333249: Other Industrial Machinery Manufacturing
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 133,500
ft2
Annual Production 150,000
units
Production Hrs. Annual 2,730
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,761 882,400
kWh
Electricity Demand $68,393 3,542
kW-mo/yr
Electricity Fees $12,149 -
Natural Gas $55,854 6,237
MMBtu
TOTAL YEARLY COSTS $195,157
RECOMMENDED SAVINGS* $45,766 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,152

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $28,381 $291,962 $25,137
377,472
kWh
$3,244
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,939 $6,474 $2,518
37,820
kWh
$3,421
-
kW-mo/yr
- -
03 2.7232: Replace existing hvac unit with high efficiency model $2,832 $36,480 $1,255
18,827
kWh
$1,411
-
kW-mo/yr
$166
-
MMBtu
-
04 2.7232: Replace existing hvac unit with high efficiency model $843 $17,694 $387
5,797
kWh
$456
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $760 $75 $335
5,016
kWh
$425
-
kW-mo/yr
- -
06 2.8121: Apply for tax-free status for energy purchases $7,011 $8,000 - - - $7,011
TOTAL RECOMMENDED $45,766 $360,685 $29,632
444,932
kWh
$8,957
-
kW-mo/yr
$166
-
MMBtu
$7,011
TOTAL IMPLEMENTED $37,152 $334,916 $28,910
434,119
kWh
$8,076
-
kW-mo/yr
$166
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs