ITAC Assessment: MZ0361
ITAC logo
ITAC Assessment: MZ0361
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product internal combustion engines
NAICS 333618: Other Engine Equipment Manufacturing
SIC 3519: Internal Combustion Engines, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 869
Plant Area 973,172
ft2
Annual Production 979,021
pieces
Production Hrs. Annual 5,912
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,621,332 30,995,286
kWh
Electricity Demand $905,510 77,866
kW-mo/yr
Natural Gas $642,932 122,461
MMBtu
Waste Disposal Costs
Water Usage $115,467 14,627
Tgal
Water Disposal $68,855 6,426
Tgal
TOTAL YEARLY COSTS $3,354,096
RECOMMENDED SAVINGS* $525,351 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings One-time Revenue or Avoided Cost Savings
01 2.4239: Eliminate or reduce compressed air usage $1,633 $6,555 $1,121
21,556
kWh
$512
-
kW-mo/yr
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $5,784 $1,000 $3,981
76,559
kWh
$1,803
-
kW-mo/yr
- - -
03 2.1233: Analyze flue gas for proper air/fuel ratio $13,797 $4,800 - - $13,797
-
MMBtu
- -
04 2.7135: Install occupancy sensors $2,158 $1,750 $2,158
41,504
kWh
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $20,374 $117,036 $6,533
125,630
kWh
$3,489
-
kW-mo/yr
- - $10,352
06 2.1122: Re-size charging openings or add a movable door on equipment $45,827 $6,720 - - $45,827
-
MMBtu
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $41,882 $33,744 $41,882
805,430
kWh
- - - -
08 3.4151: Minimize water usage $71,580 $385,388 - - - $71,580
-
Tgal
-
09 2.9114: Use solar heat to make electricty $322,316 $3,602,500 $322,316
6,198,386
kWh
- - - -
TOTAL RECOMMENDED $525,351 $4,159,493 $377,991
7,269,065
kWh
$5,804
-
kW-mo/yr
$59,624
-
MMBtu
$71,580
-
Tgal
$10,352
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs