| Assessment Year | 2016 |
|---|---|
| Principal Product | Recognition Signage, Donor Walls, Metal Etching |
| NAICS | 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers |
| SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 35 |
| Plant Area |
50,000
ft2
|
| Annual Production | 1
units
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $52,685 | 519,840 |
kWh
|
$0.10 | |
| Electricity Demand | $33,319 | 2,758 |
kW-mo/yr
|
$12.08 | |
| Electricity Fees | $2,096 | - |
|
- | |
| Natural Gas | $9,088 | 1,461 |
MMBtu
|
$6.22 | |
| LPG | $1,101 | 17 |
MMBtu
|
$63.28 | |
| Waste Disposal Costs | |||||
| Water Usage | $553 | 155 |
Tgal
|
$3.57 | |
| Water Disposal | $650 | 155 |
Tgal
|
$4.20 | |
| TOTAL YEARLY COSTS | $99,492 | ||||
| RECOMMENDED SAVINGS* | $24,359 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,215 | $16,983 |
$8,422
83,117
kWh
|
$5,793
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,863 | $7,497 |
$3,471
34,257
kWh
|
$2,392
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.7135: Install occupancy sensors | $1,418 | $825 |
$698
6,889
kWh
|
$720
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.4133: Use most efficient type of electric motors | $1,075 | $1,320 |
$637
6,285
kWh
|
$438
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $744 | $411 |
$455
4,493
kWh
|
$83
-
kW-mo/yr
|
- | $86 | $120 | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $578 | $400 |
$343
3,382
kWh
|
$235
-
kW-mo/yr
|
- | - | - | |
| 07 | 2.2437: Recover waste heat from equipment | $270 | $800 | - | - |
$270
-
MMBtu
|
- | - | |
| 08 | 2.4221: Install compressor air intakes in coolest locations | $196 | $400 |
$116
1,143
kWh
|
$80
-
kW-mo/yr
|
- | - | - | |
| TOTAL RECOMMENDED | $24,359 | $28,636 |
$14,142
139,566
kWh
|
$9,741
-
kW-mo/yr
|
$270
-
MMBtu
|
$86 | $120 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs