ITAC Assessment: LT0119
ITAC logo
ITAC Assessment: LT0119
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product FRUIT BASKETS
NAICS
n/a
SIC 2449: Wood Containers, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 100
Plant Area
n/a
Annual Production 2,200,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,593 393,904
kWh
Natural Gas $27,413 5,363
MMBtu
Wood $19,321 19,324
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,176 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,616

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $1,071 $8,900 - $1,071
-
MMBtu
-
02 2.2514: Cover open tanks $770 $500 - $770
-
MMBtu
-
03 2.4323: Use optimum size and capacity equipment $6,445 $2,400 - $6,745
-
MMBtu
$(-300.0)
04 2.4133: Use most efficient type of electric motors $250 $672 $250
3,810
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $800 - $800
11,723
kWh
- -
06 2.7261: Install timers and/or thermostats $790 $360 $790
23,154
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $50 $25 $62
879
kWh
- $(-12.0)
TOTAL RECOMMENDED $10,176 $12,857 $1,902
39,566
kWh
$8,586
-
MMBtu
$(-312.0)
TOTAL IMPLEMENTED $8,616 $11,997 $1,112
16,412
kWh
$7,816
-
MMBtu
$(-312.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs