ITAC Assessment: BS0055
ITAC logo
ITAC Assessment: BS0055
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Assembled Doors
NAICS 321911: Wood Window and Door Manufacturing
SIC 2431: Millwork
Sales Range $50
M
to 100
M
# of Employees 68
Plant Area 115,594
ft2
Annual Production 104,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,779 484,800
kWh
Electricity Demand $12,313 2,201
kW-mo/yr
Electricity Fees $2,364 -
Natural Gas $16,127 2,173
MMBtu
LPG $24,508 983
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,134 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,100 $880 $1,957
35,422
kWh
$1,143
-
kW-mo/yr
-
02 2.4224: Upgrade controls on compressors $2,383 $1,860 $1,505
27,248
kWh
$878
-
kW-mo/yr
-
03 3.6192: Use a less expensive method of waste removal $7,460 $221 - - $7,460
04 2.7135: Install occupancy sensors $831 $1,091 $831
15,041
kWh
- -
05 2.7121: Utilize daylight whenever possible in lieu of artificial light $382 $482 $382
6,919
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $672 $78 $465
8,413
kWh
$207
-
kW-mo/yr
-
07 2.4221: Install compressor air intakes in coolest locations $231 $294 $158
2,856
kWh
$73
-
kW-mo/yr
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $74 $26 $47
842
kWh
$27
-
kW-mo/yr
-
TOTAL RECOMMENDED $15,134 $4,932 $5,345
96,741
kWh
$2,329
-
kW-mo/yr
$7,460
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs