Assessment Year | 2015 |
---|---|
Principal Product | Assembled Doors |
NAICS | 321911: Wood Window and Door Manufacturing |
SIC | 2431: Millwork |
Sales Range | $50 M to 100M |
# of Employees | 68 |
Plant Area |
115,594
ft2
|
Annual Production | 104,000
pieces
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Idaho |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $26,779 | 484,800 |
kWh
|
$0.055 |
Electricity Demand | $12,313 | 2,201 |
kW-mo/yr
|
$5.59 |
Electricity Fees | $2,364 | - |
|
- |
Natural Gas | $16,127 | 2,173 |
MMBtu
|
$7.42 |
LPG | $24,508 | 983 |
MMBtu
|
$24.93 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,134 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,100 | $880 |
$1,957
35,422
kWh
|
$1,143
-
kW-mo/yr
|
- | |
02 | 2.4224: Upgrade controls on compressors | $2,383 | $1,860 |
$1,505
27,248
kWh
|
$878
-
kW-mo/yr
|
- | |
03 | 3.6192: Use a less expensive method of waste removal | $7,460 | $221 | - | - | $7,460 | |
04 | 2.7135: Install occupancy sensors | $831 | $1,091 |
$831
15,041
kWh
|
- | - | |
05 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $382 | $482 |
$382
6,919
kWh
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $672 | $78 |
$465
8,413
kWh
|
$207
-
kW-mo/yr
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $231 | $294 |
$158
2,856
kWh
|
$73
-
kW-mo/yr
|
- | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $74 | $26 |
$47
842
kWh
|
$27
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $15,134 | $4,932 |
$5,345
96,741
kWh
|
$2,329
-
kW-mo/yr
|
$7,460 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs