ITAC Assessment: MZ0360
ITAC logo
ITAC Assessment: MZ0360
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product chimney caps
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 122,300
ft2
Annual Production 478,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,439 535,689
kWh
Electricity Demand $16,698 3,976
kW-mo/yr
Natural Gas $138,730 14,516
MMBtu
Waste Disposal Costs
Water Usage $15,178 1,834
Tgal
TOTAL YEARLY COSTS $220,045
RECOMMENDED SAVINGS* $21,856 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $1,834 $5,300 $448
4,896
kWh
$1,386
-
kW-mo/yr
-
02 2.4235: Remove or close off unneeded compressed air lines $8,851 $11,852 $8,851
96,209
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,978 $18,853 $7,978
86,713
kWh
- -
04 2.2437: Recover waste heat from equipment $3,193 $8,300 - - $3,193
-
MMBtu
TOTAL RECOMMENDED $21,856 $44,305 $17,277
187,818
kWh
$1,386
-
kW-mo/yr
$3,193
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs