ITAC Assessment: AM0680
ITAC logo
ITAC Assessment: AM0680
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Dryer vents and accessories
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 150,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 4,625
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,560 1,647,220
kWh
Electricity Demand $90,019 5,406
kW-mo/yr
Electricity Fees $5,467 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,550 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,550

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $17,460 $23,910 $12,490
211,760
kWh
$4,970
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,170 $500 $3,060
51,880
kWh
$1,110
-
kW-mo/yr
- - -
03 2.3212: Optimize plant power factor $2,800 $5,010 - $2,800
-
kW-mo/yr
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,510 $2 $1,840
31,160
kWh
$670
-
kW-mo/yr
- - -
05 2.8121: Apply for tax-free status for energy purchases $1,460 $500 - - $760 - $700
06 2.7142: Utilize higher efficiency lamps and/or ballasts $425 $165 $100
1,754
kWh
$25
-
kW-mo/yr
- $300 -
07 2.7124: Make a practice of turning off lights when not needed $370 - $370
6,300
kWh
- - - -
08 2.4314: Use synthetic lubricant $355 - $260
4,402
kWh
$95
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $29,550 $30,087 $18,120
307,256
kWh
$9,670
-
kW-mo/yr
$760 $300 $700
TOTAL IMPLEMENTED $29,550 $30,087 $18,120
307,256
kWh
$9,670
-
kW-mo/yr
$760 $300 $700
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs