ITAC Assessment: MZ0359
ITAC logo
ITAC Assessment: MZ0359
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product meat hotdogs
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 349
Plant Area 239,709
ft2
Annual Production 143,000,000
lb
Production Hrs. Annual 7,752
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,387,437 28,127,973
kWh
Electricity Demand $1,142,309 55,057
kW-mo/yr
Natural Gas $1,181,123 285,958
MMBtu
Waste Disposal Costs
Water Usage $687,004 146,522
Tgal
Water Disposal $663,323 137,731
Tgal
TOTAL YEARLY COSTS $5,061,196
RECOMMENDED SAVINGS* $17,692 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $1,403 $3,100 $939
19,166
kWh
- $464
-
MMBtu
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $679 $620 $410
8,734
kWh
$269
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $609 $1,400 $609
12,419
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $7,203 $14,000 $7,203
146,992
kWh
- -
05 2.7447: Install vinyl strip / high speed / air curtain doors $2,952 $1,511 $2,952
60,214
kWh
- -
06 2.2696: Use excess cold process fluid for industrial cooling needs $4,846 $17,804 $4,846
98,898
kWh
- -
TOTAL RECOMMENDED $17,692 $38,435 $16,959
346,423
kWh
$269
-
kW-mo/yr
$464
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs