ITAC Assessment: MA0035
ITAC logo
ITAC Assessment: MA0035
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product MULTI-PLY PAPER PRODUCTS
NAICS
n/a
SIC 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 52
Plant Area
n/a
Annual Production 340,000
thousand feet
Production Hrs. Annual 2,125
hrs
Location (State) Rhode Island

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,031 849,941
kWh
Natural Gas $2,553 283
MMBtu
Fuel Oil #2 $4,829 584
MMBtu
Fuel Oil #4 $162,786 27,504
MMBtu
Fuel Oil #6 $83,874 15,352
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,374 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,657

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $35,472 $33,300 - $38,472
-
MMBtu
$(-3,000.0)
02 2.2511: Insulate bare equipment $1,444 $795 - $1,444
-
MMBtu
-
03 2.4221: Install compressor air intakes in coolest locations $235 $100 $235
2,345
kWh
- -
04 2.2511: Insulate bare equipment $8,213 $1,287 - $8,213
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $498 $913 $498
4,982
kWh
- -
06 2.4322: Use or replace with energy efficient substitutes $5,512 $9,450 $5,512
55,100
kWh
- -
TOTAL RECOMMENDED $51,374 $45,845 $6,245
62,427
kWh
$48,129
-
MMBtu
$(-3,000.0)
TOTAL IMPLEMENTED $9,657 $2,082 - $9,657
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #6 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs