ITAC Assessment: UD0153
ITAC logo
ITAC Assessment: UD0153
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product RECONDITIONED STEELDRUMS
NAICS
n/a
SIC 3412: Metal Shipping Barrels, Drums, Kegs, and Pails
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 1,375,000
pieces
Production Hrs. Annual 3,120
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $233,977 3,490,035
kWh
Natural Gas $490,835 98,569
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,943 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,921

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4322: Use or replace with energy efficient substitutes $14,805 $16,000 $14,805
291,032
kWh
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,217 - $5,217
-
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,255 $2,450 $1,543
27,550
kWh
$(-288.0)
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,666 $16,000 $4,507
80,305
kWh
$(-841.0)
-
MMBtu
TOTAL RECOMMENDED $24,943 $34,450 $26,072
398,887
kWh
$(-1,129.0)
-
MMBtu
TOTAL IMPLEMENTED $4,921 $18,450 $6,050
107,855
kWh
$(-1,129.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs