Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

713

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0835 #05 Y:2022 Reduce the pressure of compressed air to the minimum required $4,360 $625
MA0835 #03 Y:2022 Recover waste heat from equipment $18,072 $14,280
MA0836 #04 Y:2022 Turn off equipment during breaks, reduce operating time $6,264 $875
MA0836 #02 Y:2022 Recover waste heat from equipment $9,598 $34,642
MA0836 #01 Y:2022 Use waste heat from hot flue gases to preheat $16,115 $39,510
MA0739 #06 Y:2014 Utilize controls to operate equipment only when needed $475 $915
MA0739 #05 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $864 $2,635
MA0739 #01 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $5,369 $11,834
MA0723 #04 Y:2013 Use heat from boiler blowdown to preheat boiler feed water $11,047 $32,000
MA0607 #07 Y:2006 Use heat from boiler blowdown to preheat boiler feed water $6,860 $3,500
MA0607 #06 Y:2006 Ventilation system to shut off when room is not in use $10,577 $1,870
MA0607 #05 Y:2006 Use utility controlled power management $12,223 $14,000
MA0607 #04 Y:2006 Reduce ventilation air $12,889 $1,700
MA0607 #03 Y:2006 Burn a less expensive grade of fuel $14,261 $5,500
MA0607 #02 Y:2006 Reduce ventilation air $45,943 $10,400
MA0607 #01 Y:2006 Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $46,963 -
MA0565 #07 Y:2004 Install compressor air intakes in coolest locations $656 $548
MA0565 #03 Y:2004 Turn off equipment during breaks, reduce operating time $5,088 $8,000
MA0564 #04 Y:2004 Insulate bare equipment $168 $75
MA0564 #03 Y:2004 Use adjustable frequency drive or multiple speed motors on existing system $1,406 $3,226