Assessment Year | 2022 |
---|---|
Principal Product | Baked Goods and Bread |
NAICS | 311811: Retail Bakeries |
SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
Sales Range | $50 M to 100M |
# of Employees | 135 |
Plant Area |
125,000
ft2
|
Annual Production | 70,097,178
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $431,022 | 6,081,703 |
kWh
|
$0.071 | |
Electricity Demand | $191,154 | 11,321 |
kW-mo/yr
|
$16.88 | |
Electricity Fees | $1,442 | - |
|
- | |
Natural Gas | $515,463 | 53,770 |
MMBtu
|
$9.59 | |
Waste Disposal Costs | |||||
Water Usage | $47,536 | 11,013 |
Tgal
|
$4.32 | |
Water Disposal | $29,659 | 3,860 |
Tgal
|
$7.68 | |
TOTAL YEARLY COSTS | $1,216,276 | ||||
RECOMMENDED SAVINGS* | $59,333 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $27,356 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $16,115 | $39,510 | - | - |
$16,115
-
MMBtu
|
|
02 | 2.2437: Recover waste heat from equipment | $9,598 | $34,642 |
$(-2,981.0)
(-41,981)
kWh
|
$(-946.0)
-
kW-mo/yr
|
$13,525
-
MMBtu
|
|
03 | 2.2622: Replace existing chiller with high efficiency model | $9,895 | $23,950 |
$7,464
105,120
kWh
|
$2,431
-
kW-mo/yr
|
- | |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $6,264 | $875 |
$4,727
66,576
kWh
|
$1,537
-
kW-mo/yr
|
- | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $5,531 | $1,500 | - | - |
$5,531
-
MMBtu
|
|
06 | 2.1114: Limit and control secondary combustion air in furnace | $7,372 | $500 | - | - |
$7,372
-
MMBtu
|
|
07 | 2.7234: Use heat pump for space conditioning | $2,777 | $7,150 |
$2,169
30,556
kWh
|
$608
-
kW-mo/yr
|
- | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,781 | $625 |
$1,343
18,922
kWh
|
$438
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $59,333 | $108,752 |
$12,722
179,193
kWh
|
$4,068
-
kW-mo/yr
|
$42,543
-
MMBtu
|
||
TOTAL IMPLEMENTED | $27,356 | $33,725 |
$10,976
154,598
kWh
|
$3,477
-
kW-mo/yr
|
$12,903
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs