Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Baked Goods and Bread
NAICS 311811: Retail Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 135
Plant Area 125,000
ft2
Annual Production 70,097,178
lb
Production Hrs. Annual 8,760
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $431,022 6,081,703
kWh
Electricity Demand $191,154 11,321
kW-mo/yr
Electricity Fees $1,442 -
Natural Gas $515,463 53,770
MMBtu
Waste Disposal Costs
Water Usage $47,536 11,013
Tgal
Water Disposal $29,659 3,860
Tgal
TOTAL YEARLY COSTS $1,216,276
RECOMMENDED SAVINGS* $59,333 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,356

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $16,115 $39,510 - - $16,115
-
MMBtu
02 2.2437: Recover waste heat from equipment $9,598 $34,642 $(-2,981.0)
(-41,981)
kWh
$(-946.0)
-
kW-mo/yr
$13,525
-
MMBtu
03 2.2622: Replace existing chiller with high efficiency model $9,895 $23,950 $7,464
105,120
kWh
$2,431
-
kW-mo/yr
-
04 2.6212: Turn off equipment during breaks, reduce operating time $6,264 $875 $4,727
66,576
kWh
$1,537
-
kW-mo/yr
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $5,531 $1,500 - - $5,531
-
MMBtu
06 2.1114: Limit and control secondary combustion air in furnace $7,372 $500 - - $7,372
-
MMBtu
07 2.7234: Use heat pump for space conditioning $2,777 $7,150 $2,169
30,556
kWh
$608
-
kW-mo/yr
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,781 $625 $1,343
18,922
kWh
$438
-
kW-mo/yr
-
TOTAL RECOMMENDED $59,333 $108,752 $12,722
179,193
kWh
$4,068
-
kW-mo/yr
$42,543
-
MMBtu
TOTAL IMPLEMENTED $27,356 $33,725 $10,976
154,598
kWh
$3,477
-
kW-mo/yr
$12,903
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs