ITAC Assessment: UF0368
ITAC logo
ITAC Assessment: UF0368
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Asphalt and limestone products
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 2950:
Sales Range $5
M
to 10
M
# of Employees 20
Plant Area 4,000,000
ft2
Annual Production 550,000
ton
Production Hrs. Annual 2,550
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $70,381 1,374,000
kWh
Electricity Demand $56,111 10,368
kW-mo/yr
Other Gas $230,868 22,736
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,507 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,225

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Gas Savings Increase in Production Savings
01 2.3212: Optimize plant power factor $47,282 $35,000 $15,147
297,000
kWh
$32,135
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $1,231 $3,846 $584
11,443
kWh
$647
-
kW-mo/yr
- -
03 2.6231: Utilize controls to operate equipment only when needed $4,367 $1,437 $2,070
40,597
kWh
$2,297
-
kW-mo/yr
- -
04 2.2511: Insulate bare equipment $1,437 $1,407 - - $1,437
-
MMBtu
-
05 2.2511: Insulate bare equipment $194 $65 - - $194
-
MMBtu
-
06 2.4157: Establish a predictive maintenance program $340 $316 $218
4,280
kWh
$122
-
kW-mo/yr
- -
07 2.4156: Establish a preventative maintenance program $6,000 $2,304 - - - $6,000
08 4.621: Use fixtures to reduce machine changeout times $6,656 $5,000 - - - $6,656
TOTAL RECOMMENDED $67,507 $49,375 $18,019
353,320
kWh
$35,201
-
kW-mo/yr
$1,631
-
MMBtu
$12,656
TOTAL IMPLEMENTED $20,225 $14,375 $2,872
56,320
kWh
$3,066
-
kW-mo/yr
$1,631
-
MMBtu
$12,656
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Gas Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs