Assessment Year | 2005 |
---|---|
Principal Product | Asphalt and limestone products |
NAICS | 324121: Asphalt Paving Mixture and Block Manufacturing |
SIC | 2950: |
Sales Range | $5 M to 10M |
# of Employees | 20 |
Plant Area |
4,000,000
ft2
|
Annual Production | 550,000
ton
|
Production Hrs. Annual | 2,550
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $70,381 | 1,374,000 |
kWh
|
$0.051 |
Electricity Demand | $56,111 | 10,368 |
kW-mo/yr
|
$5.41 |
Other Gas | $230,868 | 22,736 |
MMBtu
|
$10.15 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $67,507 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,225 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Gas Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $47,282 | $35,000 |
$15,147
297,000
kWh
|
$32,135
-
kW-mo/yr
|
- | - | |
02 | 2.4133: Use most efficient type of electric motors | $1,231 | $3,846 |
$584
11,443
kWh
|
$647
-
kW-mo/yr
|
- | - | |
03 | 2.6231: Utilize controls to operate equipment only when needed | $4,367 | $1,437 |
$2,070
40,597
kWh
|
$2,297
-
kW-mo/yr
|
- | - | |
04 | 2.2511: Insulate bare equipment | $1,437 | $1,407 | - | - |
$1,437
-
MMBtu
|
- | |
05 | 2.2511: Insulate bare equipment | $194 | $65 | - | - |
$194
-
MMBtu
|
- | |
06 | 2.4157: Establish a predictive maintenance program | $340 | $316 |
$218
4,280
kWh
|
$122
-
kW-mo/yr
|
- | - | |
07 | 2.4156: Establish a preventative maintenance program | $6,000 | $2,304 | - | - | - | $6,000 | |
08 | 4.621: Use fixtures to reduce machine changeout times | $6,656 | $5,000 | - | - | - | $6,656 | |
TOTAL RECOMMENDED | $67,507 | $49,375 |
$18,019
353,320
kWh
|
$35,201
-
kW-mo/yr
|
$1,631
-
MMBtu
|
$12,656 | ||
TOTAL IMPLEMENTED | $20,225 | $14,375 |
$2,872
56,320
kWh
|
$3,066
-
kW-mo/yr
|
$1,631
-
MMBtu
|
$12,656 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Gas Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs