| Assessment Year | 2015 |
|---|---|
| Principal Product | Toothpaste, mouthwash, deodorant |
| NAICS | 325611: Soap and Other Detergent Manufacturing |
| SIC | 2844: Perfumes, Cosmetics, and Other Toilet Preparations |
| Sales Range | $50 M to 100M |
| # of Employees | 65 |
| Plant Area |
110,475
ft2
|
| Annual Production | 130,000
pieces
|
| Production Hrs. Annual | 6,120
hrs
|
| Location (State) | Maine |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $104,707 | 1,361,760 |
kWh
|
$0.077 |
| Electricity Demand | $41,234 | 3,952 |
kW-mo/yr
|
$10.43 |
| Electricity Fees | $1,959 | - |
|
- |
| Natural Gas | $66,069 | 5,083 |
MMBtu
|
$13.00 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $10,484 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,776 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,369 | $11,834 |
$5,369
69,811
kWh
|
- | - | |
| 02 | 2.6218: Turn off equipment when not in use | $1,543 | $500 |
$1,543
20,064
kWh
|
- | - | |
| 03 | 2.2136: Install / repair insulation on steam lines | $927 | $1,570 | - | - |
$927
-
MMBtu
|
|
| 04 | 2.6231: Utilize controls to operate equipment only when needed | $880 | $1,285 |
$880
11,440
kWh
|
- | - | |
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $864 | $2,635 |
$864
11,239
kWh
|
- | - | |
| 06 | 2.6231: Utilize controls to operate equipment only when needed | $475 | $915 |
$475
6,177
kWh
|
- | - | |
| 07 | 2.8123: Pay utility bills on time | $426 | $500 | - | $426 | - | |
| TOTAL RECOMMENDED | $10,484 | $19,239 |
$9,131
118,731
kWh
|
$426 |
$927
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $3,776 | $3,855 |
$2,423
31,504
kWh
|
$426 |
$927
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs