ITAC Assessment: MA0739
ITAC logo
ITAC Assessment: MA0739
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Toothpaste, mouthwash, deodorant
NAICS 325611: Soap and Other Detergent Manufacturing
SIC 2844: Perfumes, Cosmetics, and Other Toilet Preparations
Sales Range $50
M
to 100
M
# of Employees 65
Plant Area 110,475
ft2
Annual Production 130,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $104,707 1,361,760
kWh
Electricity Demand $41,234 3,952
kW-mo/yr
Electricity Fees $1,959 -
Natural Gas $66,069 5,083
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,484 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,776

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,369 $11,834 $5,369
69,811
kWh
- -
02 2.6218: Turn off equipment when not in use $1,543 $500 $1,543
20,064
kWh
- -
03 2.2136: Install / repair insulation on steam lines $927 $1,570 - - $927
-
MMBtu
04 2.6231: Utilize controls to operate equipment only when needed $880 $1,285 $880
11,440
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $864 $2,635 $864
11,239
kWh
- -
06 2.6231: Utilize controls to operate equipment only when needed $475 $915 $475
6,177
kWh
- -
07 2.8123: Pay utility bills on time $426 $500 - $426 -
TOTAL RECOMMENDED $10,484 $19,239 $9,131
118,731
kWh
$426 $927
-
MMBtu
TOTAL IMPLEMENTED $3,776 $3,855 $2,423
31,504
kWh
$426 $927
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs