ITAC Assessment: WI0037
ITAC logo
ITAC Assessment: WI0037
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product PISTONS, MOTORS, PUMPS
NAICS
n/a
SIC 3594: Fluid Power Pumps and Motors
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area
n/a
Annual Production 140,000
pieces
Production Hrs. Annual 4,950
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $208,522 2,775,791
kWh
Natural Gas $41,865 12,827
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $58,030 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,783

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4312: Improve lubrication practices $3,862 - $3,862
51,290
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,535 - $1,535
20,516
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $43,747 $33,748 $43,747
582,356
kWh
- -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $885 $1,000 $1,086
14,361
kWh
$(-201.0)
-
MMBtu
-
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,732 - $3,732
-
kWh
- -
06 2.3132: Recharge batteries on during off-peak demand periods $1,189 - $1,189
-
kWh
- -
07 2.2437: Recover waste heat from equipment $2,695 $1,500 - $2,695
-
MMBtu
-
08 2.1233: Analyze flue gas for proper air/fuel ratio $385 $500 - $685
-
MMBtu
$(-300.0)
TOTAL RECOMMENDED $58,030 $36,748 $55,151
668,523
kWh
$3,179
-
MMBtu
$(-300.0)
TOTAL IMPLEMENTED $53,783 $36,248 $51,289
617,233
kWh
$2,494
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs