Assessment Year | 2020 |
---|---|
Principal Product | Ready mix concrete |
NAICS | 327320: Ready-Mix Concrete Manufacturing |
SIC | 3273: Ready-Mixed Concrete |
Sales Range | $1 M to 5M |
# of Employees | 60 |
Plant Area |
304,920
ft2
|
Annual Production | 690,000
ton
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $172,249 | 2,422,625 |
kWh
|
$0.071 | |
Electricity Demand | $73,895 | 10,418 |
kW-mo/yr
|
$7.09 | |
Electricity Fees | $39,357 | - |
|
- | |
Natural Gas | $493,421 | 82,148 |
MMBtu
|
$6.01 | |
Waste Disposal Costs | |||||
Water Usage | $108,602 | 11,309 |
Tgal
|
$9.60 | |
TOTAL YEARLY COSTS | $887,524 | ||||
RECOMMENDED SAVINGS* | $88,111 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $28,202 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1224: Replace boiler | $58,212 | $300,000 | - | - |
$58,212
-
MMBtu
|
- | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $23,376 | $54,000 | - | - |
$23,376
-
MMBtu
|
- | |
03 | 2.4112: Install soft-start to eliminate nuisance trips | $1,697 | $2,500 |
$1,697
23,872
kWh
|
- | - | - | |
04 | 2.8123: Pay utility bills on time | $1,563 | - | - | - | - | $1,563 | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,436 | $3,500 |
$1,191
16,725
kWh
|
$245
-
kW-mo/yr
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,228 | $1,500 |
$1,040
14,631
kWh
|
$188
-
kW-mo/yr
|
- | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $599 | $1,500 |
$599
8,425
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $88,111 | $363,000 |
$4,527
63,653
kWh
|
$433
-
kW-mo/yr
|
$81,588
-
MMBtu
|
$1,563 | ||
TOTAL IMPLEMENTED | $28,202 | $60,500 |
$2,830
39,781
kWh
|
$433
-
kW-mo/yr
|
$23,376
-
MMBtu
|
$1,563 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs