ITAC Assessment: CO0536
ITAC logo
ITAC Assessment: CO0536
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Finished household furniture
NAICS 337122: Nonupholstered Wood Household Furniture Manufacturing
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $5
M
to 10
M
# of Employees 72
Plant Area 36,000
ft2
Annual Production 822
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Montana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,699 1,230,800
kWh
Electricity Demand $23,157 2,883
kW-mo/yr
Electricity Fees $96 -
Natural Gas $19,142 3,676
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $71,989 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,530

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings Increase in Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,720 $16,720 $5,870
123,000
kWh
$1,900
-
kW-mo/yr
- $(-1,050.0) -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,530 $1,050 $3,420
71,700
kWh
$1,110
-
kW-mo/yr
- - -
03 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $3,380 $8,630 $(-420.0)
(-8,700)
kWh
$(-140.0)
-
kW-mo/yr
$3,940
-
MMBtu
- -
04 2.6212: Turn off equipment during breaks, reduce operating time $3,310 $870 $3,310
69,300
kWh
- - - -
05 2.2437: Recover waste heat from equipment $2,750 $1,410 - - $2,750
-
MMBtu
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,299 $132 $983
20,592
kWh
$316
-
kW-mo/yr
- - -
07 4.424: Improve space comfort conditioning $50,000 $301,060 - - - - $50,000
TOTAL RECOMMENDED $71,989 $329,872 $13,163
275,892
kWh
$3,186
-
kW-mo/yr
$6,690
-
MMBtu
$(-1,050.0) $50,000
TOTAL IMPLEMENTED $4,530 $1,050 $3,420
71,700
kWh
$1,110
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs