ITAC Assessment: MS0184
ITAC logo
ITAC Assessment: MS0184
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Automotive Wiring Connectors
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 74
Plant Area 35,000
ft2
Annual Production 230,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $158,489 2,861,832
kWh
Electricity Demand $19,017 5,571
kW-mo/yr
Electricity Fees $7,368 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,661 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (non-haz) Savings
01 2.2511: Insulate bare equipment $3,051 $348 $2,362
68,746
kWh
- $689 -
02 2.7261: Install timers and/or thermostats $571 $375 $441
8,466
kWh
- $130 -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $14,523 $6,599 $7,924
42,790
kWh
- $6,599 -
04 2.7261: Install timers and/or thermostats $702 $875 $542
10,604
kWh
- $160 -
05 2.4221: Install compressor air intakes in coolest locations $1,464 $2,153 $1,127
32,804
kWh
$6
-
kW-mo/yr
$331 -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $946 $2,073 $731
14,026
kWh
- $215 -
07 2.4314: Use synthetic lubricant $44 $17 $21
406
kWh
- $6 $17
-
gal
08 4.512: Condense operation into one building $56 $25 - - $56 -
09 3.5244: Recover metals from casting sand $9,304 $32 - - - $9,304
-
gal
TOTAL RECOMMENDED $30,661 $12,497 $13,148
177,842
kWh
$6
-
kW-mo/yr
$8,186 $9,321
-
gal
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs