ITAC Assessment: ST0022
ITAC logo
ITAC Assessment: ST0022
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product ELECTRIC APPLIANCES
NAICS
n/a
SIC 3634: Electric Housewares and Fans
Sales Range $5
M
to 10
M
# of Employees 125
Plant Area
n/a
Annual Production 300,000
pieces
Production Hrs. Annual 2,780
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,276 514,947
kWh
Natural Gas $4,031 587
MMBtu
Fuel Oil #4 $16,974 2,592
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,856 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,973

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #4 Savings
01 2.2136: Install / repair insulation on steam lines $1,958 $3,117 - - $1,958
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,376 $160 $5,376
49,238
kWh
- -
03 2.7447: Install vinyl strip / high speed / air curtain doors $3,760 $420 - - $3,760
-
MMBtu
04 2.3191: Use demand controller or load shedder $4,743 $1,900 $4,743
-
kWh
- -
05 2.6121: Reduce hot water temperature to the minimum required $148 - - $148
-
MMBtu
-
06 2.7421: Reduce glazed areas in buildings $186 $91 - - $186
-
MMBtu
07 2.4221: Install compressor air intakes in coolest locations $256 $85 $256
2,345
kWh
- -
08 2.2437: Recover waste heat from equipment $1,502 $1,000 - - $1,502
-
MMBtu
09 2.7142: Utilize higher efficiency lamps and/or ballasts $4,480 $1,246 $4,480
41,032
kWh
- -
10 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $3,680 $5,600 $3,680
33,705
kWh
- -
11 3.4154: Eliminate leaks in water lines and valves $767 $5 - $767
-
MMBtu
-
TOTAL RECOMMENDED $26,856 $13,624 $18,535
126,320
kWh
$915
-
MMBtu
$7,406
-
MMBtu
TOTAL IMPLEMENTED $14,973 $2,007 $10,112
92,615
kWh
$915
-
MMBtu
$3,946
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #4 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs