ITAC Assessment: GT0478
ITAC logo
ITAC Assessment: GT0478
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product HARDWARE (HINGES)
NAICS
n/a
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 42,000,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $242,219 4,231,243
kWh
Natural Gas $93,293 26,094
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,933 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2514: Cover open tanks $1,480 $1,910 - $1,480
-
MMBtu
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $1,120 $900 - $1,120
-
MMBtu
-
03 2.7229: Air condition only space necessary $940 $240 - $940
-
MMBtu
-
04 2.4221: Install compressor air intakes in coolest locations $420 $450 $420
14,947
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $120 - $120
4,396
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,880 $22,730 $1,880
67,995
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $973 $2,750 $1,186
17,585
kWh
- $(-213.0)
TOTAL RECOMMENDED $6,933 $28,980 $3,606
104,923
kWh
$3,540
-
MMBtu
$(-213.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs