| Assessment Year | 1992 |
|---|---|
| Principal Product | HARDWARE (HINGES) |
| NAICS |
n/a
|
| SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 200 |
| Plant Area |
n/a
|
| Annual Production | 42,000,000
pieces
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | Alabama |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $242,219 | 4,231,243 |
kWh
|
$0.057 |
| Natural Gas | $93,293 | 26,094 |
MMBtu
|
$3.58 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $6,933 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2514: Cover open tanks | $1,480 | $1,910 | - |
$1,480
-
MMBtu
|
- | |
| 02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,120 | $900 | - |
$1,120
-
MMBtu
|
- | |
| 03 | 2.7229: Air condition only space necessary | $940 | $240 | - |
$940
-
MMBtu
|
- | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $420 | $450 |
$420
14,947
kWh
|
- | - | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $120 | - |
$120
4,396
kWh
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,880 | $22,730 |
$1,880
67,995
kWh
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $973 | $2,750 |
$1,186
17,585
kWh
|
- | $(-213.0) | |
| TOTAL RECOMMENDED | $6,933 | $28,980 |
$3,606
104,923
kWh
|
$3,540
-
MMBtu
|
$(-213.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs